Static Oven Range
Models:
CR6
(600 mm)
CR9
(900 mm)
INSTALLATION AND OPERATION MANUAL
Zobrazit stránku 0
1 2 3 4 5 6 ... 23 24

Shrnutí obsahu

Strany 1 - Static Oven Range

230636-10 For use in GB & IE Static Oven Range Models: CR6 (600 mm) CR9 (900 mm) INSTALLATION AND OPERATION MANUAL

Strany 2

8 2. Improper operation is therefore almost impossible, however bad operation practices can reduce the life of the appliance and produce a poor qual

Strany 3 - Contents

9 Part 4 Operation d. The pilot should now remain alight - if not, repeat Steps (a. to (c. above. e. ‘Full Flame’ can now be achieved by depressing

Strany 4 - Part 1 Introduction

10 Part 4 Operation - Main Burner / Thermostat 1. With the pilot burner alight, rotate the oven thermostat control knob to the desired oven temper

Strany 5 - Gas Supply Requirements

11 Part 5 Cleaning and Maintenance CORRECT LEVEL FOR FRYING MEDIUM WHEN AT FRYING TEMPERATURE, KEEP TOPPED UP INDICATES CORRECT FRYING MEDIUM LEVEL W

Strany 6

12 Part 5 Cleaning and Maintenance Trivets and Burners a. Remove the trivets from the top of the appliance, taking note that the trivets are manuf

Strany 7

13 Part 5 Cleaning and Maintenance Gas Control Valve Re-Greasing The gas control valve should be dismantled and greased every 6 months to ensure the

Strany 8 - Gas Connection

14 Part 6 Gas Conversion Gas Conversion Procedure NOTE:  These conversions should only be carried out by qualified persons. All connections must b

Strany 9 - Commissioning

15 Part 6 Gas Conversion Aeration Adjustment 1. Check / adjust the main burner aeration gap. This gap should be set to the dimensions shown in the

Strany 10 - Description of Controls

16 Part 6 Gas Conversion Oven Main Burner - CR6 Model Only 1. Ensure that the gas supply is turned off at the main supply. 2. Open the oven door a

Strany 11

17 Part 6 Gas Conversion Pilot Burner 1. To remove the oven pilot injector, from inside the oven, unscrew and remove the thermocouple from the mou

Strany 12

The reproduction or copying of any part of this manual by any means whatsoever is strictly forbidden unless authorized previously in writing by the ma

Strany 13 - WHEN COLD

18 Part 6 Gas Conversion Gas Regulator NOTE: The regulator supplied is convertible between Natural Gas and LP Gas, but it’s outlet pressure is fixed

Strany 14

19 Part 6 Gas Conversion Gas Specifications - Non-UK Only - UK Only Natural Gas LP Gas (Propane) Open Burner Burner Injector Ø 2.10 mm Ø 1.30 mm

Strany 15 - Periodic Maintenance

20 Replacement Parts List When ordering spare parts, please quote the part number and the description as listed below. If the part required is not li

Strany 16 - Gas Conversion Procedure

21 Oven 022446 Oven Burner (CR6). 230441 Oven Burner (CR9). 235493 Eurosit Gas Control Valve. 018682 Thermocouple (1500 mm Long). 230586 Piezo Ignite

Strany 18

1 Contents CR6 Gas Static Oven Ranges (600 mm Wide). CR9 Gas Static Oven Ranges (900 mm Wide). Part 1 Introduction ...

Strany 19

We are confident that you will be delighted with your Cobra Series Ranges, and it will become a most valued appliance in your commercial kitchen. To

Strany 20

3 The CR6 Oven is a 490 mm (internal) full width oven fitted with French style opening doors. The oven burner is a 24-26 MJ oven burner and has pilot

Strany 21

4 Part 2 Specifications Gas Connection CR6 Model Gas supply connection point is located at the rear of the appliance, approximately 130 mm from the r

Strany 22 - Replacement Parts List

5 Location 1. This appliance must be installed in a suitably ventilated room to prevent dangerous build up of combustion products. 2. Installation

Strany 23 - General

6 The regulator outlet pressure is fixed ex-factory for the gas type that the regulator is converted to and it is NOT to be adjusted. The regulator c

Strany 24

7 Part 3 Installation Commissioning The following commissioning checks must be carried out before the Range is handed over for use, to ensure th